what should come first in a water line schematic diagram?
If I am going to store water from a deep well into and elevated water tank or cistern what should come after the deep well in a schematic diagram? like deep well(water source)-->gate valve--->water tank....
Public Comments
- on the schematic, probably the pump if the pump is located in the well if the pump is not submerged in the well, then there will probably be a valve for isolation prior to the pump
- OK Deep Well (Water Source) ---> Check Valve (If pump is above ground) --->Ball Valve ---> Pump (If above ground) --->Hose Bibb (Could help in priming or other ways) --->Ball Valve --->Water Tank I hope that this helps
Powered by Yahoo! Answers